UPDATE

Automated Tunnel and Shaft inspections

Project Data

Start date:

10/03/2022

End date:

10/31/2023

Budget:

£250,000

Summary

An innovative new trial alongside engineering and built environment consultancy, Arup is seeing Boston Dynamics’ robotic dog ‘Spot’ deployed in confined spaces during regular maintenance activities in tunnels and shafts, drastically improving safety across the power network in London, the East, and the southeast of England.

What is the project about?

The future of tunnel inspections is being revolutionised thanks to UK Power Networks newest robot companion.

Equipped with a series of high-powered lights, cameras and advanced imaging sensors, Spot can connect with Arup’s newly built web based inspection viewer platform, Loupe 360. The platform includes a machine learning interface to automate detection and analyse areas of degradation within hard-to-reach locations with remarkable accuracy.

How we’re doing it

UK Power Networks’ initial trials near its Leicester Square substation has been met with widespread positivity.

By comparing GoPro-captured and advanced thermal imaging with historical data and images taken during traditional inspections, UK Power Networks can create a more efficient maintenance programme while slashing the number of hours staff need to spend in confined spaces during inspections.

The comprehensive data capture and use of machine learning techniques allow UK Power Networks to identify the rate of change in the condition of infrastructure, improving the understanding of their deterioration and enabling a more predictive, risk-based inspection and maintenance programme to be adopted.

What makes it innovative

Tunnels and shafts, which have long been considered to be of higher risk to maintenance staff, currently require maintenance in excess of £1m per year across the power Network in London, the East, and the southeast of England. It is estimated the project could initially save £162k per year, rising to £324k per year by 2028.

What we’re learning

The findings taken from the trial will allow UK Power Networks to identify how the solution could be deployed across the network. Currently, maintenance inspections require many highly trained Health and Safety and Engineering personnel to carry out tunnel and shaft inspections. It is estimated the project could reduce staff time spent in high-risk locations by up to 50%.

There are 47 DNO-owned tunnels in UK Power Network’s operating area, accounting for nearly a third of all DNO owned tunnels in Great Britain, with over 160 tunnel inspections taking place every year.

Images & Videos

automated-tunnel-IMG_7966

automated-tunnel-2

automated-tunnel-robot-dog

thinking outside the box icon
Share your ideas

If you have an idea that could reshape or revolutionise the way we work, we want to hear from you.

Submit an idea
cta-bg-details