Past Projects
Proactive optimised assets and practices
Thor Hammer
Thor Hammer is a new assessment tool that allows our overhead line inspectors to quickly and safely test the condition of wooden poles.
SEARCH
Past Projects
Proactive optimised assets and practices
Thor Hammer is a new assessment tool that allows our overhead line inspectors to quickly and safely test the condition of wooden poles.
Past Projects
We’re developing and delivering long-term software for analysing ‘timed connections’, which allow cheaper and faster connections for electric ve
All Live Projects
Net zero and energy system transition
Flexibility and commercial evolution (DSO)
Trading Connections is a project designed to analyse connection queues and create a dynamic, publicly accessible tool that visualizes demand, capacity
Past Projects
Proactive optimised assets and practices
New non-intrusive condition monitoring equipment which monitors the voltage and current of transformers are being installed. This equipment uses a sel
Net zero and energy system transition
Flexibility and commercial evolution (DSO)
TransPower will investigate network impact and flexibility services for vehicle-to-grid (V2G) from domestic, commercial and public charging through de
Past Projects
This is an innovative project carried out in consortium with other network operators which includes SP Energy Networks, Northern Power Grid, Scottish
Strategic Innovation Fund
Past Projects
Net zero and energy system transition
Data and digitalisation
Trinity aims to address the growing complexity of distribution networks brought about by new technologies, the integration of flexibility, and the dig
Past Projects
This project will be applicable to all tunnels containing electrical assets. These assets are expected to primarily be LV, HV and EHV cables and assoc
Past Projects
Proactive optimised assets and practices
A review of soil characteristics in combination with rainfall is likely to provide detail to be able to develop an operational faults forecast model.
Past Projects
This project investigates the methodology required to develop Underground Cable Health Index Tool to enable better decision making on whether to repla
Past Projects
UK Power Networks will trial a new substation centralised protection and control system. We will verify & validate the use of this system for the prot
Past Projects
Urban Energy Club will test how the virtual allocation of shared assets can support a more inclusive approach of procuring network flexibility from do
If you have an idea that could reshape or revolutionise the way we work, we want to hear from you.
Submit an idea