SEARCH

Your results

Showing 142 items

Past Projects

Net zero and energy system transition 

Emerge

Emerge aims to speed up the process for upgrading customer supplies in the event of an emergency, such as their boiler breaking unexpectedly. Working

Past Projects

Enable

Enable is developing research to gain a better understanding of the needs of electric vehicle drivers with disabilities, in particular, those reliant

Past Projects

Flexibility and commercial evolution (DSO)

Energy Exchange

In the transition to Distribution System Operator, we are increasingly connecting distributed generation customers. Distributed Generators – mainly

Past Projects

Energywise (also known as Vulnerable Customers and Energy Efficiency)

The award-wining Energywise project explored how DNOs can work collaboratively with energy suppliers and local trusted organisations to deliver approp

Past Projects

Engineered Pole Products

The GB Electricity Distribution Operators rely on a tried and tested timber material to support distribution overhead lines, however, the sustainabili

Past Projects

Net zero and energy system transition 

Proactive optimised assets and practices 

Data and digitalisation 

Envision

Envision is developing a software based machine learning tool that will generate greater Low Voltage (LV) network insights faster and cheaper compared

Past Projects

Proactive optimised assets and practices 

EPRI Research Collaboration

We are joining the Electric Power Research Institute’s (EPRI) research consortium, leveraging advanced research in the field of overhead transmissio

Past Projects

Firefly

Firefly is aiming to trial how we can serve customers through energy efficiency. It is conducting an extensive exploration of global best practice to

Strategic Innovation Fund

Consumer vulnerability 

Net zero and energy system transition 

Flexibility and commercial evolution (DSO)

Flex Direct

Flex Direct aims to make energy flexibility markets more accessible by creating new commercial arrangements. It will empower social landlords to offer

Past Projects

Flexible Plug and Play

UK Power Networks has completed Flexible Plug and Play, its £9.7m, 3 year innovation project to trial new technologies and commercial arrangements in

Flexible Urban Networks – Low Voltage

Flexible Urban Networks – Low Voltage (FUN-LV) demonstrated the potential of power electronics devices to help defer network reinforcement.

Past Projects

Freight Electric Vehicles in Urban Europe (FREVUE)

The overview of the project is to: Collect data to facilitate the assessment of the impact of freight EV use on distribution networks. Analyse the

thinking outside the box icon
Share your ideas

If you have an idea that could reshape or revolutionise the way we work, we want to hear from you.

Submit an idea
cta-bg-details